one major Landscape lamp The charging circuit adopts a dual MOS series control circuit, which can reduce the voltage loss of the circuit by nearly half compared with the use of diodes. The use of PWM energy-saving control greatly increases the power consumption. 2. The load mode adopts pure light control. When the light is dark, the light sensor system will automatically light up. 3. Scientific battery management method. When over discharge occurs, the battery voltage will promote charging. After maintenance and compensation, it can be used normally. Direct charging and floating charging are used to connect rechargeable batteries. 4. All restrictions of all industrial chips and closed components can operate normally in cold, high temperature and humid environments. At the same time, major Landscape lamp The use of crystal oscillator time control can make the time control more accurate.

The working voltage of a single bulb for LED tunnel lighting is very low, about 3V, so the power consumption of a low-voltage working environment is half of the power required for the same strong light. The tunnel lamp has a long service life and does not need regular maintenance and inspection. After a period of use, the traditional major Landscape lamp The brightness of the tunnel lamp will be greatly reduced, but its attenuation is only 20% of that of the tunnel lamp. Moreover, the tunnel lamp is small in size and can be made into various shapes to adapt to various environments. The shell of the tunnel lamp is of integrated design, which is durable and not easy to be damaged. Each light source inside can be installed and removed separately, which is very convenient in the future maintenance process, and the overall design can ensure good heat dissipation effect. The heat dissipation rack inside the shell, the airflow and the heat emitted by the full contact with the air, effectively reduce the major Landscape lamp And prolongs the service life of the tunnel lamp.

install major Landscape lamp The construction site shall be provided with safety slogans, warning signs and safety operation instruction boards, which shall not be removed or moved at will. Any movement shall be approved by the person in charge of site construction. When working on site, please pay attention to vehicle access and mechanical lifting. During normal construction, there should be no less than 2 people, and when there is only one person on site, no operation is allowed. Obey the instructions of on-site construction personnel, obey the assignment, unite and complete the production task. Materials on site shall be stacked neatly, and hazardous materials, chemical reagents and flammable materials must be placed separately. It is strictly prohibited to work in flammable and explosive places, open fire, smoking, etc. In operation major Landscape lamp Before that, please check whether the operation site is safe, whether the road is unblocked and whether the protective measures are complete. The tools used should be restored after the work is completed. Please wear safety belt when working at heights, cliffs and steep slopes without protective facilities.

Main pole of high pole lamp: major Landscape lamp When the height of the main pole exceeds 20m, the steel plate with a wall thickness of 5.6mm is usually used as the main material. After the overall welding of the high pole lamp, the internal and external surface layers need to be hot-dip galvanized and qualified galvanized. This process can ensure that the main pole will not rust for 15 years. Lifting system: the lifting system is regarded as the core part of the high pole lamp. The landing action of the light panel depends entirely on the landing system. The landing system of high pole lamp is mainly hoist and wire rope. First, install the elevator on the main rod. Weathering and rain will not cause line aging. Secondly, the hoist seldom starts. If major Landscape lamp If the light source has not been damaged in ten years, it will not need to be touched in ten years. Lamp cap: Whether it is LED lamp cap or low pressure sodium lamp, the light source is the main symbol of the whole set of high pole lamp. If the light source is broken and the high pole lamp is broken, the selection of light source quality is particularly important.

The power supply of LED project lights is high-voltage alternating current. During installation, please keep away from the place that is easy to access, and properly ground the lamps to avoid electric shock accidents. When wiring, the installation personnel shall select the appropriate power line according to the power of the bulb actually used, and separate the power supply to avoid affecting the normal use of flood lights. major Landscape lamp It is designed to be waterproof and moisture-proof, and its protection grade can reach IP65. It can withstand the test of rain, but cannot work underwater, and its protection level cannot meet the requirements of underwater work. major Landscape lamp The installation position of shall be able to bear the weight of the projection lamp, and its bearing capacity shall be 10 times greater than the weight of the projection lamp, so that the lamp can be firmly installed and the danger of falling in the future can be avoided.

1. The installation height of LED energy-saving mining lamp is determined according to the environment, because the environment will change the reflection efficiency of the lamp. Generally, the height of LED energy-saving ceiling lamp should be more than 5 meters, and the wires should not be close to the enclosure of the ceiling. If necessary, install it. If it is less than 3m, protective measures shall be taken to prevent the vehicle from contacting it. two major Landscape lamp Waterproof and low-temperature treatment. Select the ceiling lamp with waterproof function and waterproof transformer. The chip package of the bulb is wrapped with high temperature insulating material, which can not only be waterproof, but also prevent the bulb from being damaged at low temperature under harsh conditions. three major Landscape lamp Price Use flat hard copper wire to connect the main line of LED energy-saving mining lamp wiring to the lamp, install one in five rings, and connect them evenly to three phase lines according to the load balance requirements.