阿拉上海后花园论坛

Service hotline:
 Universal banner
Your current location: home page > Hot information

contact us Contact Us

Shandong Lanyue Photoelectric Technology Co., Ltd

400 Tel: 400-6432-167

Mobile number: 18866000049

Fixed telephone: 0534-7281003

Fax No.: 0534-7281007

QQ:202519309/ eighty-one million five hundred and twenty-four thousand four hundred and fourteen

mail box: [email protected]

                [email protected]

Address: Dezhou (Yucheng) High tech Industrial Development Zone, China

Shijiazhuang professional factory lighting manufacturer

2021-01-25
 Shijiazhuang professional factory lighting manufacturer

1. Lamp holder: it needs to be sealed through the lamp holder. major Plant lighting The waterproof treatment of lamp cap can ensure the service life of street lamp. Therefore, the selection of street lamp housing is very important. 2. Controller: when selecting, pay attention to whether the style is waterproof. When installing the controller, it is usually placed in the road to better avoid wind and sun exposure. 3. Battery: it needs to have certain waterproof performance. In order to install the battery, please bury the battery about 40cm underground to avoid flooding. After that, test major Plant lighting Head to check whether the street lamp lights up normally. If it is opened, it can be used normally; otherwise, it needs to be replaced. Light poles need to be hot-dip galvanized to ensure smooth surface, no color difference, no pinholes, and no skin peeling after use.

 Shijiazhuang professional factory lighting manufacturer

The bulb shall be firm and upright and shall not be loose or skewed. If the enamel umbrella is corroded or deformed major Plant lighting It needs to be replaced in time. Before using electric tools, please check whether the wiring, plug, socket, grounding and leakage protection devices are in good condition. Do not use them if they are damaged. Safety slogans, warning signs and safety operation instruction boards shall be set up on the construction site. Materials on the site shall be stacked orderly and stably and handled from top to bottom. When using hand-held electric tools, please wear personal protective equipment and the power cord should be empty. It is forbidden for non operators to use it on site major Plant lighting Power switches, wires and various mechanical equipment. Outdoor construction is not allowed in rainy season. Outdoor construction should be carried out after the rain is dry. The Quality Safety Department is responsible for preparing labor protection articles to ensure the safety of construction personnel.

 Shijiazhuang professional factory lighting manufacturer

During use, the bulb will be hit by wind and rain, which may cause its angle deviation, thus affecting the lighting effect. If any deviation is found, it must be adjusted in time. Check the bulb surface regularly. If on major Plant lighting Cracks found on the surface glass of the bulb may cause rainwater to enter the bulb, which will seriously affect the use effect and service life of the bulb. The bulb should be removed immediately and sent to the original factory for repair. Avoid all kinds of serious accidents, such as leakage. Clean the lamp regularly to maintain its brightness. Turn off the lamp before cleaning it major Plant lighting The power supply of the lamp shall be cleaned with a dry cloth or dry cloth to prevent the lamp from being damp, let alone with chemical or corrosive substances. Otherwise, the bulb will be corroded, which may cause accidents.

 Shijiazhuang professional factory lighting manufacturer

(1) Recommended installation height of 50W LED energy-saving mining lamp: 3-5 meters; Installation distance: 5-8m. (2) Recommended installation height of 100W LED energy-saving mining lamp: 6-8m; Installation distance: 8-10 m. (3) Recommended installation height of 120W LED energy-saving mining lamp: 8-10m; Installation distance: 8-10 m. (4)150W major Plant lighting Recommended installation height: 10-15m; Installation distance: 8-12m. (5) major Plant lighting 200W Recommended installation height: 10-15m; Installation distance: 10-15m. (6) LED energy-saving mining lamp 300W recommended installation height: 15-20m; Installation distance: 20-25m. (7) Recommended installation height of 450W LED energy-saving mining lamp: 15-20m; Installation distance: 25-30m

 Shijiazhuang professional factory lighting manufacturer

When the solar street lamp leaves the factory, the working time is generally set according to the customer's requirements. major Plant lighting The start and stop time of is determined by the street lamp controller. Most of the controllers are installed inside the light door, while most of the lithium battery storage and control integrated machines produced by our company are installed at the bottom of the solar panel. Controller adjustment is divided into manual adjustment and remote control adjustment. The external adjustment button can be adjusted manually. However, most of the current markets are remote control adjustment. This type of controller needs to be equipped with a remote control to adjust the working time. How to adjust major Plant lighting The time of also depends on the type of controller used.

 07.png

Science and technology lead energy conservation, and wisdom lights up life