阿拉上海后花园论坛

Service hotline:
 Universal banner
Your current location: home page > News Center > Technical Information

contact us Contact Us

Shandong Lanyue Photoelectric Technology Co., Ltd

400 Tel: 400-6432-167

Mobile number: 18866000049

Fixed telephone: 0534-7281003

Fax No.: 0534-7281007

QQ:202519309/ eighty-one million five hundred and twenty-four thousand four hundred and fourteen

mail box: [email protected]

                [email protected]

Address: Dezhou (Yucheng) High tech Industrial Development Zone, China

What precautions should be taken when lighting the construction site?

2020-07-25 09:04:19
second

The construction site lighting provides great convenience for the construction of the construction industry and saves construction time. What precautions should be taken when installing site lighting facilities? Next let's have a look!

The construction personnel need to receive relevant construction training. The construction site must follow the instructions of the instructor. Before construction, they should wear protective equipment. After drinking, they should not work. Before installation, please check whether the lamp shade is intact or damaged. The bulb and lamp body shall not be bent, and the fixing screws of each part shall be tightened with spring eyeliner, and shall not be loosened. The lamp cap conductor of the closed lamp shall be protected by heat resistant insulating tube. Check the machine before use. Bench drills, toothless saws, cutting machines, etc., and electric tools for processing are equipped with leakage protection devices.

 Site lighting supplier

The bulb shall be firm and upright and shall not be loose or skewed. If the enamel umbrella is corroded or deformed, it needs to be replaced in time. Before using electric tools, please check whether the wiring, plug, socket, grounding and leakage protection devices are in good condition. Do not use them if they are damaged. Safety slogans, warning signs and safety operation instruction boards shall be set up on the construction site. They shall not be removed or moved at will, and the movement must be approved by the person in charge of the construction site. Materials on site shall be stacked orderly and stably, and shall be disposed from top to bottom. Do not transfer or move fire-fighting equipment, appliances, sand piles, fire water, etc.

When using hand-held electric tools, please wear personal protective equipment and the power cord should be empty. Non operators are not allowed to use power switches, wires and various mechanical equipment on site. Outdoor construction is not allowed in rainy season. Outdoor construction should be carried out after the rain is dry. The Quality Safety Department is responsible for preparing labor protection articles to ensure the safety of construction personnel. The buckle of the transparent cover shall be intact and easy to use, to prevent the cover from falling off and fasten a reliable hook. During maintenance, the transparent cover and reflector of the lamp body shall be cleaned and wiped clean, and the lampshade and reflector that cannot be cleaned on site shall be replaced. Vertical wires shall have a black tie wire tied to the insulating support and shall not be wound with this wire.

The above are precautions for lighting at the construction site. I hope the above content will help you. Welcome to inquire!