阿拉上海后花园论坛

Service hotline:
 Universal banner
Your current location: home page > News Center > Technical Information

contact us Contact Us

Shandong Lanyue Photoelectric Technology Co., Ltd

400 Tel: 400-6432-167

Mobile number: 18866000049

Fixed telephone: 0534-7281003

Fax No.: 0534-7281007

QQ:202519309/ eighty-one million five hundred and twenty-four thousand four hundred and fourteen

mail box: [email protected]

                [email protected]

Address: Dezhou (Yucheng) High tech Industrial Development Zone, China

Installation steps and precautions of LED project light

2020-07-25 09:04:19
second

Everyone often sees LED project lights. Because of their good use effect, energy saving and good performance, they are deeply loved by everyone. What are the precautions when installing searchlights? Take everyone to find out!

The power supply of LED project lights is high-voltage alternating current. During installation, please keep away from the place that is easy to access, and properly ground the lamps to avoid electric shock accidents. When wiring, the installation personnel shall select the appropriate power line according to the power of the bulb actually used, and separate the power supply to avoid affecting the normal use of flood lights. The floodlight is designed to be waterproof and moisture-proof, and its protection grade can reach IP65. It can withstand the test of rain, but cannot work underwater, and its protection level cannot meet the requirements of underwater work.

The installation position of the projection lamp shall be able to bear the weight of the projection lamp, and its bearing capacity shall be 10 times greater than the weight of the projection lamp, so that the lamp can be firmly installed and the danger of falling in the future can be avoided. The working ambient temperature of the projection lamp shall be between - 25 ° C and+45 ° C. The temperature in the workplace shall not be higher than 45 ° C to extend the service life of the searchlight. When installing the bulb, first drill holes on the wall or ground to install expansion screws, then install the LED projection lamp, lock it with screws, and then connect the 3-core signal wire of the LED projection lamp to the controller. Adjust the screw on the retaining clip to adjust the projector to the appropriate lighting angle. According to the power of the transformer and the power of the projection lamp, calculate how many guardrail lamps each transformer can carry.

 LED project light

There are three power lines at the bottom of the projection lamp. ACPOWERINPUT is the AC power input terminal and connected to the AC power grid. This wire is 3-core. First install the controller, and then connect the controller directly to the LED projector. Each controller can only carry a fixed number of LED project lights. The controller should be placed between the 85th and 86th units for better signal. Connect the switching power supply to the 220V main power supply, and then use the air switch and time switch. Control the LED projection lamp to be powered on evenly, and then plug the plug on the main controller into the 220V power supply.

The above are the installation steps and precautions for installing LED project lights. The installation shall be carried out according to the characteristics and operating rules of the bulb. This not only saves installation time, but also reduces the potential accident caused by incorrect installation. I hope the above is helpful to everyone. If you need products, please contact us!